• Minn. man, Schneider, buys surplus NC light tower for research

  • In doing so, he brushed aside the GSA's 2-year-old inspection that concluded it would cost $2.3 million to renovate the structure that resembles an oil rig platform.
    • email print
  • Raleigh, N.C.
    By Martha Waggoner, Associated Press
    Posted Nov. 23, 2012 @ 5:00 am
      • »  EVENTS CALENDAR